8" Water Main Tap
Muller Road, Burlington
Water main tapping work completed on Muller Road in Burlington, connecting new service to the existing distribution main.

Our Projects
Muller Road, Burlington
Water main tapping work completed on Muller Road in Burlington, connecting new service to the existing distribution main.
Diana Drive, North Reading
Manhole repair work completed on Diana Drive in North Reading to restore structural integrity and access.
Main Street, Medford
Water leak repair work completed on Main Street in Medford, locating and correcting the failure with minimal disruption.
Wakefield
Water and sewer utility work completed on Lowell Street in Wakefield.
North Reading
Drainage improvement work completed on Plymouth Street in North Reading to manage stormwater and protect the roadway.
Gloucester, MA
Tim Zanelli Excavating worked alongside Aquarene Utility at Gloucester High School on a major direct drilling project.
Wilmington
Horizontal direct drilling project completed on Federal Street in Wilmington.
Sub — ETTI
Lynnfield
Excavation work completed in Lynnfield, delivering precise site preparation for the utility scope.
Boston College
Manhole work at Boston College using a vacuum truck for safe, precise access and cleanout.
Other
54 additional photos from the field that are not tied to a single identified project or location.
Whether you need water and sewer utility work, hydro excavation, site services, trucking, materials, or concrete services, Tim Zanelli Excavating LLC is ready to help.